CIP Monthly Status Report – February 2017

Headworks
In February, the City of San José advanced two projects through the Project Delivery Model stage gate process: the Cogeneration Facility Project and the Outfall Bridge and Levee Improvement Project.

Staff advertised a Request for Qualifications to prequalify vendors for programwide system integrator services, and held an open house for prospective vendors to share information on upcoming design-build procurements. On the Cogeneration Facility Project, the design-builder advanced the design based on the approved basis of design report. The Digested Sludge Dewatering Facility Project team began alternatives analysis work. Alternatives analysis efforts continued for the Filter Rehabilitation, Nitrification Clarifier Rehabilitation, and Facility-wide Water Systems Improvements projects.

The design consultant for the Advanced Facility Control and Meter Replacement Project submitted the draft conceptual design report. The Headworks Improvements and New Headworks project team advanced the basis of design and procurement documents. The Blower Improvements Project preliminary design also continued this month.

Six active construction projects made significant progress this month. Testing and commissioning continued on the Digester Gas Compressor Upgrade and Emergency Diesel Generators projects. Staff continued to coordinate process shutdowns for the Digester and Thickener Facilities Upgrade Project. A major inspection was completed to assess the condition of several primary effluent pipelines near a heavily corroded concrete pipeline.

CIP Monthly Status Report – February 2017