City of San José, Capital of Silicon Valley  
  City Home City Services About San José Visitors Feedback
 
department title

Wednesday, May 23, 2012

  Building Division Home
background image


Permits Online

Organization Charts
Application Forms
Plan Submittal Info
Plan Review Items
Permit Information
Inspection Information
Fee Information
Building Information
Electrical Information
Plumbing Information
Mechanical Information
Accessibility Regulations
Energy Regulations
Adopting Ordinance
General Information
Zoning Ordinance
Planning Division
Bureau of Fire Prevention
Development Services
Current Wait Times


 
CSJ Site Index
Accessibility Instructions
Problems viewing site

 

 

Plan Check Notes for 2010 CBC

Note #

Subject

PCN-1

Information Required on Drawings

PCN-2

Procedure for Review of Deferred Submittals

PCN-3

Architect or Engineer of Record for Buildings with Multiple Design Professionals

PCN-4 Periodic Inspection for Single-pass fillet welds not exceeding 5/16 inch in size
PCN-5 Structural Observation
PCN-6 Use of Computer Software in Analysis and Design of Structures
PCN-7 Voluntary Upgrade of Existing Structures
PCN-8 Use of sprinkler to mitigate required fire ratings up to 1-hr
PCN-9 Installation of New Equipment in Existing Buildings
PCN-11 Typical Special Inspection Comments
PCN-13 Wood Shear Wall Tie-down Anchoring Devices
PCN-14 Foundation Piers in Single Family Residences
PCN-15 Use of Simpson H1 Type Hardware for Shear Transfer
PCN-16 Trusses and Non-Bearing Walls
PCN-18 Accessibility Requirements for Multifamily Buildings with Multiple Entrances
PCN-19 Understanding the Limit of Projections
PCN-20 Concrete Structural Slabs Supporting Light Framed Construction
PCN-21 Fire Protection Requirements for Buildings Containing Courts
PCN-22 Occupancy Classification and Construction Requirements for Rowhouses / Townhomes*** (Under construction)
PCN-23 Clarify Maximum Height of R-2 Occupancies in V-A Construction
PCN-24 Suspended Ceiling Bracing Systems
PCN-25 Security Doors Equiped with Special Delayed Egress Locks
PCN-26 Open Free-standing Accessory Structures
PCN-27 Walk- In Refrigeration

PCN-28

Information on Plans for ASHRAE 62.2 compliance

 

 

 

Last Modified Date: 3/21/2012

 
 

City Home - City Services - About San José - Visitors - Feedback - Search

 

As a customer-driven organization, the City of San José welcomes any suggestions you might have to help us serve you better.