San José Municipal Water New Offices Project

FILE NO: ER22-114

Project description

The Project would construct a new administrative building and storage building that would serve as the new office facility for Muni Water. The Project would be located at 3025 Tuers Road in San José, CA. The majority of the existing buildings on the site would be demolished under this Project. The proposed site improvements include construction of the two new buildings, landscaping, parking areas, a new communications tower, and associated equipment installation to support the new buildings. The Project would also result in the removal of 24 trees on-site.

The Project would also include construction of communications equipment at two offsite locations and at the Project site. A temporary communications antenna would be installed at 3870 Charter Park Drive, a new communications pole would be installed at 4791 Mountaire Court, and a new temporary communications tower would be installed at the 3025 Tuers Road Project site.

lOCATION

The approximately 3.4-acre project site is located at 3025 Tuers Road in the City of San José. The project site is located within the southeastern portion of a larger, approximately 25.8-acre parcel that is also developed with the Los Lagos Golf Course facility. No changes are proposed outside of the approximately 3.4-acre project site or to the golf course facility.

The two offsite locations where the communications equipment would be installed are located in east San José. The 3870 Charter Park Drive site is located approximately six miles southwest of the Project site. The 4791 Mountaire Court site is located approximately 11 miles southeast from the Project site.

ASSESSOR'S PARCEL NUMBERs

499-35-001, 679-37-060, 462-60-013

CIRCULATION

December 9, 2022 through January 3, 2023

PROJECT DOCUMENTS

San José Municipal Water New Offices Initial Study
Responses to Comments on Muni Water New Offices IS/MND
Appendix A - Air Quality and GHG Modeling
Appendix B - Special-Status Species Database Query Results
Appendix C - Cultural Resources Technical Memo
Appendix D - Geotechnical Report
Appendix E - Greenhouse Gas Reduction Strategy Compliance Checklist
Appendix F - Phase I Environmental Site Assessment
Appendix G - Local Transportation Analysis
Mitigation Monitoring and Reporting Program (MMRP)

ENVIRONMENTAL PROJECT MANAGER

Cort Hitchens
408-794-7386
Cort.Hitchens@sanjoseca.gov