RWF Emergency Generators Package 2A Project

File No. PP14-076

The City of San José (the City) was the lead agency for the San José-Santa Clara Regional Wastewater Facility Emergency Generators Project Initial Study/Mitigated Negative Declaration (IS/MND; State Clearinghouse No. 2013082051; City of San José File Number PP13-049). The City adopted the IS/MND for the Emergency Diesel Generators Project (Project) on January 22, 2014. The IS/MND evaluated potential environmental impacts that could occur as a result of implementing the Project, and provided applicable mitigation to reduce the intensity of potential environmental impacts. Subsequent to adoption of the IS/MND, the Project has undergone further development. Specifically, the City has modified the Project area along the southern and western boundaries of the site in part to accommodate an additional access, and has identified temporary construction laydown/staging areas that differ from those previously contemplated. Because the City has proposed these changes following IS/MND adoption, this addendum to the IS/MND is required to meet the requirements of the California Environmental Quality Act (CEQA).

Location

2890 North 1st Street. Council District: 4.

Considered

December 10, 2014

Project Documents

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer