Alviso Park Master Plan Update

File No. PP16-132

The project proposes an update to the Alviso Park Master Plan and includes components such as pedestrian paths, park entryway gateway, wayfinding markers, landscaping and furniture intended to present a cohesive design. Improvements and renovations to existing facilities include the swimming pool and associated restroom, picnic areas and playgrounds, and softball/baseball field. New facilities proposed include an enclosed sun deck adjacent to the swimming pool, shade structures at the picnic areas, outdoor fitness equipment and walking paths, a dog park, a Bay Trail segment, a community plaza with shade structure, and youth practice baseball and soccer fields.

Location

Southeast corner of Grand Boulevard and North First Street, on 23.5 acres of City-owned land comprising five parcels including the existing Alviso Park (APNs: 015-43-002, 015-43-020, 015-43-022, 015-43-023, and 015-44-013).

Circulation

June 30, 2017 to July 31, 2017

Project Documents

Environmental Project Manager

Krinjal Mathur
(408) 535-7874
krinjal.mathur@sanjoseca.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer