City of San José
Home MenuPopular Searches
Residents » Advanced Components » Custom Pages
Custom Documents, Images & Calendar
Document Central » Planning, Building & Code Enforcement » Planning Division » Environmental Planning » Environmental Review » Active EIRs
- ER21-298 FIVE WOUNDS URBAN VILLAGE PLAN UPDATE
- PDC18-036 1655 Berryessa Rd Mixed-use Development Project
- 0 Seely Ave Mixed-Use Project (PDC21-035/PD22-022/ER21-284)
- 1065 South Winchester Blvd Mixed-Use Project (SP21-006/ER21-035)
- 19 North Second Street Mixed-Use Project
- 1605 South 7th Street Project (H24-031)
- 1881 West San Carlos Project
- 250 Stockton Avenue Office Project (H21-052)
- 255 West Julian Street (Arbor Building)
- 380 N 1st Street Residential Project (H23-007)
- 420 South Second and Third Street Mixed-Use Project
- 550 E. Brokaw Project
- 2023-2031 Housing Element Update (ER21-032)
- 2030 Greenhouse Gas Reduction Strategy and Addendum
- 211-281 River Oaks Parkway Residential (H23-041)
- 27 S First St Mixed-Use Project
- 200 Park Office Project
- 1000 South De Anza Blvd Residential Project (H23-029)
- 1312 El Paseo & 1777 Saratoga Avenue Mixed-Use Village Project
- 3896 Stevens Creek Commercial Project (CP19-031/ER20-020)
- 4300 Stevens Creek Boulevard Mixed-Use Project
- 4300 Stevens Creek Boulevard Mixed-Use Project Addendum
- 5670 Camden Avenue Residential Project
- Adobe North Tower
- Almaden Boulevard Tower Project
- Phase I Environmental Site Assessment
- PP16-037 NOP Figures
- PP16-037 Levitt Pavilion NOP FINAL
- PP16-037 Complied EIR Scoping Comments_201606301304031498
- 9. H17-006 Final MMRP
- 7. H17-006 Appendix E - Conformance with the Greenhouse Gas Reduction Strategy
- 6. H17-006 Appendix D - Geotechnical Investigation
- 5. H17-006 Appendix C - Historic Evaluation
- 4. H17-006 Appendix B - Archaeological Report Public
- 3. H17-006 Appendix A - Tree Survey
- 2. H17-006 ADIS-Working Draft 01082018_Clean
- 1. H17-006 Addendum Cover Page
- H16-024_Signed_NOA
- H16-024_NOP_111816
- H16-024 SEIR Errata
- Draft SEIR Museum Place 02.10.17 with Graphics
- Appendix I - Notice of Preparation and Comment Letters
- Appendix H - Water Supply Assessment
- Appendix G - Traffic Operations Study
- Appendix F - Noise Report
- Appendix E - Phase I Environmental Site Assessment
- Appendix D - Geotechnical Report
- Appendix C - Historic Report
- Appendix B - Air Quality
- Appendix A - Initial Study with Graphics
- SJ1625_museumplace_DEIR_3-31-17
- SCVWD_03292017
- Santa Clara County_03292017
- MuseumPlace.UNITEHERE19.COMMENTS
- 033117_SCVAS_SJ_Museum Place
- SP17-031 2nd amendment_201706281234531872
- H16-024 First Amendment - Museum Place 06.08.17
- Midpoint School District Responses_201405121906583703
- Appendix F - Midpoint_Hydrology and Water Quality_201404041827361010
- Appendix E - Soil-Mgmt-Plan_201404041840028965
- Appendix D - Phase I_201404041830171978
- Appendix C - Midpooint Construction and Operational TAC Impacts_201404041829413534
- Appendix B - Midpoint at 237-Loading Dock Noise Study_201404041829053370
- Appendix A - Midpoint Traffic Memo_201404041829017276
- Addendum Midpoint at 237 Office and Industrial Project - PD13-039_201404041850349712
- Julian EIR Addendum 10_18_17
- Appendix D. Long-Range Cumulative Traffic Impact Analysis
- Appendix C. Phase I and Phase II Environmental Site Assessments
- Appendix B. Geotechnical Investigation
- Appendix A. Tree Survey
- H17-005_Appendices_201709011346541134
- H17-005_Addendum
- FinalAddendum_201706011902472107
- Appendix B -Traffic Analysis
- Appendix A - Phase I
- Gateway Tower Public Draft SEIR August 2016 FINAL with figures-csj
- Gateway Tower First Amendment to the DSEIR
- Gateway NOA
- Combined - Gateway Tower Screencheck NOP April 2016
- Appendix C NOP and Responses to the NOP
- Appendix B Historic Project Assessment
- Appendix A-5 - Traffic Operations Study
- Appendix A-4 - Environmental Noise Assessment
- Appendix A-3 - Phase I Environmental Site Assessment
- Appendix A-2 - Preliminary Geotechnical Engineering Investigation
- Appendix A-1 - Air Quality and Greenhouse Gas Emissions Assessment
- Appendix A Gateway Tower Initial Study August 2016 with figures
- PDC16-006_NOP_Comment_Letters
- NOP PDC16-006 signed
- SP18-001_NOP-postWebsite
- PP12-068_Addendum_201210261042077653
- PDC09-006_FEIR_Addendum_201210261133174845
- Flea_Market-FinalEIR-Circulated_201210261134096421
- Flea_Market_DEIR_12-22-06_201210261214414700
- PDC15-059_Equinix_Data_Center_Addendum_020916
- Appendix_D-Acoustical_Design_Assessment
- Appendix_C-Environmental_Noise_Assessment
- Appendix_B-Air_Quality_Assessment
- Appendix_A-Energy_Efficiency
- PP15-102_NOP_Oct_2015
- NOP Scoping Meeting Notices 20170307
- Figure 3 (proposed downtown boundary change)
- Figure 2 (vicinity)
- Downtown Strategy Revised NOP 20170309 FINAL
- Downtown Strategy Revised NOP 20170309 FINAL
- H17-050 Cityview Plaza Residential Tower NOP_201802141806288516
- PDC17-040 Draft NOP Cambrian Park Plaza Feb 2018 final
- H15-061 Blanchard Road NOP 100516
- Cambrian Park Plaza 3-5-18 Community Meeting Comments
- H15-061 Blanchard Road NOP 100516
- (WEB-READY) Final IS Addendum - Auzerais Residential Development - 5March2018_201803051324427367
- Appendix E Transportation Impact Analysis
- Appendix D Tree Inventory
- Appendix C Bio Resources Assessment
- Appendix B CalEEMod Data
- Appendix A NOP Comments Received
- PDC15-58 America Ctr III FEIR (11-17-17S)
- PDC15-058 PD15-053 America Ctr III SEIR (06-07-17)
- Appendix E Transportation Impact Analysis
- Appendix D Tree Inventory
- Appendix C Bio Resources Assessment
- Appendix B CalEEMod Data
- Appendix A NOP Comments Received
- Addendum - Agnews East Parklands_201404221406390532
- PDC17-026_Appendix A Arborist Report
- PDC17-026_Addendum-Public_201712151708493585
- PDC17-026 Errata
- H16-036 S. 2nd Street Student Housing - Initial Study - March 2017_1
- H16-036 Appendix F - Traffic Operations Analysis
- H16-036 Appendix E - Environmental Site Assessment
- H16-036 Appendix D - Geotechnical Investigation
- H16-036 Appendix C - Soil Resources Report
- H16-036 Appendix B - Historic Report
- H16-036 Appendix A - TAC Assessment and Addendum
- EIR Addendum 237_at_First Homewood Suites Sept 2014 with figures_201409041412183744
- Appendix E - Drainage Impact Analysis_201409041412102649
- Appendix D - Phase I ESA_201409041408570125
- Appendix C - Burrowing Owl Survey Report_201409041408546218
- Appendix B - Environmental Noise Assessment_201409041412137650
- Appendix A - Traffic Impact Analysis_201409041407424490
- NOPcommentscombined
- NOP_final
- NOP_CommentsCombined
- 2nd NOP 4300 Stevens Creek Boulevard 01.12.18 FINAL
- Appendix H - Transportation Demand Managment Plan
- Appendix H - Traffic Operations Analysis
- Appendix G - Noise and Vibration Assessment
- Appendix F - Phase II Environmental Site Assessment
- Appendix E - Soil Resource Report
- Appendix D - Historic Resources Report
- Appendix C - Biological Assessment
- Appendix B - Arborist Report
Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.