City of San José
Home MenuPopular Searches
Residents » Advanced Components » Custom Pages
Custom Documents, Images & Calendar
Document Central » Planning, Building & Code Enforcement » Planning Division » Environmental Planning » Environmental Review » Negative Declarations / Initial Studies
- Mitzi Place Apartments
- Moorpark Avenue Multi-Family Residential Project (C20-001 and H20-035)
- Main Guard Shack (ER23-142)
- Muni Water New Offices Project (ER22-114)
- Newby Island Bank Remediation (PD19-007)
- Oakland Road Comfort Suites Hotel Project
- Oakland Road Industrial Project (H20-018)
- Oakland Road Addendum (SP21-042)
- Old Bayshore Hwy Project (H18-053)
- Our Lady of La Vang Church Project (SP19-028)
- Page Street Housing Project
- Pavilion Inn Transitional Housing Project
- Pecten Industrial General Plan Amendment
- Portswood Drive GPA (GP20-001)
- Presentation High School Master Plan (SP18-008)
- Public Storage on Capitol Expressway
- Morningstar Sanhita
- River Oaks Stormwater Capture
- Roosevelt Park Apartments Mixed-Use Development
- Rotten Robbie on Story Rd (CP18-027)
- Rotten Robbie #42 Project
- 5853 Rue Ferrari Project
- San Carlos/Josefa Plaza Project
- San Carlos Hyatt Hotel (SP18-012)
- Santa Clara University Faculty Housing
- Notice of Intent for NPDES Permit for Residual Aquatic Pesticide Discharges to Waters of the US From Algae and Aquatic Weed Control Application
- PP19-052 Non-Native Invasive Plant Removal and Control Exemption
- Appendix G - Storm Drain Impact Analysis
- Appendix E_Phase I and II
- Appendix D - Geotechnical Report
- InitialStudy_Exemption
- Initial Study Exemption Off Sale
- Appendix G - Race and WSanCarlos_TOA
- Appendix F - Race and San Carlos Noise 06192017
- Appendix C - Historic Report
- Appendix B - Tree Survey Report
- Appendix A - Race-SanCarlos Constr TAC
- GP17-004_Cottle_AppendixC_LongRangeTIA
- GP17-004_Cottle_AppendixB_Noise
- GP17-004_Cottle_AppendixA_PhaseIESA
- Cottle_PublicDraftISND_092917
- Tropicana Shopping Center Commercial Building IS - 100915
- Terra at Topgolf Responses to Comments - 11.9.16
- PDC16-013 MND
- PDC16-013 - ROC - Text Revisions
- PDC16-013 - ROC - Attachment D Successful Congdons Tarplant Mitigation
- PDC16-013 - ROC - Attachment C Revised Noise Analysis
- PDC16-013 - ROC - Attachment B Supplemental AQ memo
- PDC16-013 - ROC - Attachment A Comment Letters
- PDC16-013 - Response to Comments
- Initial Study - TopGolf at Terra Project - for web (1)
- Initial Study - TopGolf at Terra Project - for web
- Appendix I - Transportation Impact Assessment - for web
- Appendix H - Noise Assessment
- Appendix G - Storm Drain Impact Analysis
- Appendix F - Phase II Soil and Groundwater Investigation
- Appendix E - Phase I Environmental Site Assessment
- Appendix D-2 - Preliminary Geotechnical Investigation for Retail-Hotel Site
- Appendix D-1 - Preliminary Geotechnical Investigation for Topgolf Facility Site
- Appendix B-2 - Arborist Report
- Appendix B-1 - Biological Resources Report
- Appendix A - Air Quality Report
- Terra at Topgolf Responses to Comments - 11.9.16
- PDC16-013 MND
- PDC16-013 - ROC - Text Revisions
- PDC16-013 - ROC - Attachment D Successful Congdons Tarplant Mitigation
- PDC16-013 - ROC - Attachment C Revised Noise Analysis
- PDC16-013 - ROC - Attachment B Supplemental AQ memo
- PDC16-013 - ROC - Attachment A Comment Letters
- PDC16-013 - Response to Comments
- Initial Study - TopGolf at Terra Project - for web (1)
- Initial Study - TopGolf at Terra Project - for web
- Appendix I - Transportation Impact Assessment - for web
- Appendix H - Noise Assessment
- Appendix G - Storm Drain Impact Analysis
- Appendix F - Phase II Soil and Groundwater Investigation
- Appendix E - Phase I Environmental Site Assessment
- Appendix D-2 - Preliminary Geotechnical Investigation for Retail-Hotel Site
- Appendix D-1 - Preliminary Geotechnical Investigation for Topgolf Facility Site
- Appendix B-2 - Arborist Report
- Appendix B-1 - Biological Resources Report
- Appendix A - Air Quality Report
- Terra at Topgolf Responses to Comments - 11.9.16
- PDC16-013 MND
- PDC16-013 - ROC - Text Revisions
- PDC16-013 - ROC - Attachment D Successful Congdons Tarplant Mitigation
- PDC16-013 - ROC - Attachment C Revised Noise Analysis
- PDC16-013 - ROC - Attachment B Supplemental AQ memo
- PDC16-013 - ROC - Attachment A Comment Letters
- PDC16-013 - Response to Comments
- Initial Study - TopGolf at Terra Project - for web (1)
- Initial Study - TopGolf at Terra Project - for web
- Appendix I - Transportation Impact Assessment - for web
- Appendix H - Noise Assessment
- Appendix G - Storm Drain Impact Analysis
- Appendix F - Phase II Soil and Groundwater Investigation
- Appendix E - Phase I Environmental Site Assessment
- Appendix D-2 - Preliminary Geotechnical Investigation for Retail-Hotel Site
- Appendix D-1 - Preliminary Geotechnical Investigation for Topgolf Facility Site
- Appendix B-2 - Arborist Report
- Appendix B-1 - Biological Resources Report
- Appendix A - Air Quality Report
- Terra at Topgolf Responses to Comments - 11.9.16
- PDC16-013 MND
- PDC16-013 - ROC - Text Revisions
- PDC16-013 - ROC - Attachment D Successful Congdons Tarplant Mitigation
- PDC16-013 - ROC - Attachment C Revised Noise Analysis
- PDC16-013 - ROC - Attachment B Supplemental AQ memo
- PDC16-013 - ROC - Attachment A Comment Letters
- PDC16-013 - Response to Comments
- Initial Study - TopGolf at Terra Project - for web (1)
- Initial Study - TopGolf at Terra Project - for web
- Appendix I - Transportation Impact Assessment - for web
- Appendix H - Noise Assessment
- Appendix G - Storm Drain Impact Analysis
- Appendix F - Phase II Soil and Groundwater Investigation
- Appendix E - Phase I Environmental Site Assessment
- Appendix D-2 - Preliminary Geotechnical Investigation for Retail-Hotel Site
- Appendix D-1 - Preliminary Geotechnical Investigation for Topgolf Facility Site
- Appendix B-2 - Arborist Report
- Appendix B-1 - Biological Resources Report
- Appendix A - Air Quality Report
- Terra at Topgolf Responses to Comments - 11.9.16
- PDC16-013 MND
- PDC16-013 - ROC - Text Revisions
- PDC16-013 - ROC - Attachment D Successful Congdons Tarplant Mitigation
- PDC16-013 - ROC - Attachment C Revised Noise Analysis
- PDC16-013 - ROC - Attachment B Supplemental AQ memo
- PDC16-013 - ROC - Attachment A Comment Letters
- PDC16-013 - Response to Comments
- Initial Study - TopGolf at Terra Project - for web (1)
- Initial Study - TopGolf at Terra Project - for web
- Appendix I - Transportation Impact Assessment - for web
- Appendix H - Noise Assessment
- Appendix G - Storm Drain Impact Analysis
- Appendix F - Phase II Soil and Groundwater Investigation
- Appendix E - Phase I Environmental Site Assessment
- Appendix D-2 - Preliminary Geotechnical Investigation for Retail-Hotel Site
- Appendix D-1 - Preliminary Geotechnical Investigation for Topgolf Facility Site
- Appendix B-2 - Arborist Report
- Appendix B-1 - Biological Resources Report
- Appendix A - Air Quality Report
- PDC12-022_Phase_1_ESA_Appendices
- PDC12-022_Draft_MND_Initial_Study_092415
- PDC12-022_Appendix_B_Phase_I_ESA_091614
- CP16-039 Social Service Agency Responses to Comment
- C16-034-CP16-039 Senter Road Project 5.31.2017 - Initial Study
- C16-034-CP16-039 NOI
- C16-034-CP16-039 MND
- C16-034-CP16-039 Appendix E - Traffic Impact Analysis
- C16-034-CP16-039 Appendix D - Noise and Vibration Assessment
- C16-034-CP16-039 Appendix C - Phase I Environmental Site Assessment
- C16-034-CP16-039 Appendix B - Web Soil Survey
- C16-034-CP16-039 Appendix A - Health Risk Assessment
- Santa Clara Inn (aka, Casa Novo) - Environmental Assessment1
- Santa Clara Inn FONSI Request for Release of Funds
- PP17-047_Response-to-Comments_Pond A18 South Gate Levee Repair
- PP17-047_Pond A18_PUBLIC DRAFT-CD
- PP15-114 Air System Upgrade_Public Draft IS_01.28-02.17_
- PP15-055 Mitigated Negative Declaration
- PP15-055 Initial Study web
- PP15-055 Errata 11.3.15
- PP15-055 Appendix B - Air Quality
- PP15-055 Appendix A - Draft MMRP
- PP15-055 Appendix E - Focused TIA
- PP15-055 Appendix C - Biological Resource Assessment
- PP14-098 Iron Salts Initial Study FINAL
- 5. Attachment 3 - 3. FEMA Floodplain Map
- 4. Attachment 3 - 2. Process Hazard Analysis Study
- 3. Attachment 3 - 1. Hazardous Materials Survey Report
- 2. ResponseTo Comments Letter -2-5
- 1. Response to Comments Letter
- PP15-120 Construction Enabling _Final Addendum Compiled 040116
- 209470-Cogen IS_Publication_Final_201404141641576291
- PP16-009_Cogen-Cover_RTC
- PP16-009_Attachment A-Cogen Addendum SWRCB Letter_delineated
- PP16-009 Cogeneration Facility Addendum_Public Draft
- GP16-011-VTA-nocomment
- GP16-011-Draft Initial Study_PublicCir_201710171832299085
- GP16-011-County-nocomment
- GP16-011 Rotten Robbie Errata
- GP16-011 - Mitigated Negative Declaration_Revised_201710171827400329
- GP16-011 - Appendix H - Greenhouse Gas Technical Analysis
- GP16-011 - Appendix G - GPA Cumulative Traffic Analysis
- GP16-011 - Appendix F - Oakland Road Rotten Robie TIA 10.12.17_Final_withfigures_appendices
- GP16-011 - Appendix E - Noise Report
- GP16-011 - Appendix D - Phase I
- GP16-011 - Appendix C - Tree Survey
- GP16-011 - Appendix B - Rotten Robbie Health Risk Assessment Memo Revised
- GP16-011 - Appendix A - Rotten Robbie Air Quality Report_201710171746492310
- 209470-Cogen IS_Publication_Final_201404141641576291
- PP16-009_Cogen-Cover_RTC
- PP16-009_Attachment A-Cogen Addendum SWRCB Letter_delineated
- PP16-009 Cogeneration Facility Addendum_Public Draft
- GP16-011-VTA-nocomment
- GP16-011-Draft Initial Study_PublicCir_201710171832299085
- GP16-011-County-nocomment
- GP16-011 Rotten Robbie Errata
- GP16-011 - Mitigated Negative Declaration_Revised_201710171827400329
- GP16-011 - Appendix H - Greenhouse Gas Technical Analysis
- GP16-011 - Appendix G - GPA Cumulative Traffic Analysis
- GP16-011 - Appendix F - Oakland Road Rotten Robie TIA 10.12.17_Final_withfigures_appendices
- GP16-011 - Appendix E - Noise Report
- GP16-011 - Appendix D - Phase I
- GP16-011 - Appendix C - Tree Survey
- GP16-011 - Appendix B - Rotten Robbie Health Risk Assessment Memo Revised
- GP16-011 - Appendix A - Rotten Robbie Air Quality Report_201710171746492310
- 209470-Cogen IS_Publication_Final_201404141641576291
- PP16-009_Cogen-Cover_RTC
- PP16-009_Attachment A-Cogen Addendum SWRCB Letter_delineated
- PP16-009 Cogeneration Facility Addendum_Public Draft
- GP16-011-VTA-nocomment
- GP16-011-Draft Initial Study_PublicCir_201710171832299085
- GP16-011-County-nocomment
- GP16-011 Rotten Robbie Errata
- GP16-011 - Mitigated Negative Declaration_Revised_201710171827400329
- GP16-011 - Appendix H - Greenhouse Gas Technical Analysis
- GP16-011 - Appendix G - GPA Cumulative Traffic Analysis
- GP16-011 - Appendix F - Oakland Road Rotten Robie TIA 10.12.17_Final_withfigures_appendices
- GP16-011 - Appendix E - Noise Report
- GP16-011 - Appendix D - Phase I
- GP16-011 - Appendix C - Tree Survey
- GP16-011 - Appendix B - Rotten Robbie Health Risk Assessment Memo Revised
- GP16-011 - Appendix A - Rotten Robbie Air Quality Report_201710171746492310
- 209470-Cogen IS_Publication_Final_201404141641576291
- GP16-011-VTA-nocomment
- GP16-011-Draft Initial Study_PublicCir_201710171832299085
- GP16-011-County-nocomment
- GP16-011 Rotten Robbie Errata
- GP16-011 - Mitigated Negative Declaration_Revised_201710171827400329
- GP16-011 - Appendix H - Greenhouse Gas Technical Analysis
- GP16-011 - Appendix G - GPA Cumulative Traffic Analysis
- GP16-011 - Appendix F - Oakland Road Rotten Robie TIA 10.12.17_Final_withfigures_appendices
- GP16-011 - Appendix E - Noise Report
- GP16-011 - Appendix D - Phase I
- GP16-011 - Appendix C - Tree Survey
- GP16-011 - Appendix B - Rotten Robbie Health Risk Assessment Memo Revised
- GP16-011 - Appendix A - Rotten Robbie Air Quality Report_201710171746492310
- PDC17-019 RTC_alledits_clean
- 9. PDC17-019 - Appendix F - Noise and Vibration Assessment
- 8.3 PDC17-019 - Appendix E 3 - Additional Subsurface Investigation
- 8.2 PDC17-019 - Appendix E 2 - Phase I Environmental Site Assessment
- 8.1 PDC17-019 - Appendix E 1 - Limited Phase II Subsurface Investigation
- 7. PDC17-019 - Appendix D - Geotechnical Engineering Investigation
- 6.1 PDC17-019 - Appendix C2 - Section 106 Confirmation_201801121316234759
- 6. PDC17-019 - Appendix C1 - Historic Resources Report
- 5. PDC17-019 - Appendix B - Tree Assessment
- 4. PDC17-019 - Appendix A - Air Quality Assessment
- 3. PDC17-019 Race and Grand IS EA_Revised 01182018
- 2. PDC17-019 MND
- 11. PDC17-019 - Appendix H - Explosives and Fire Hazards Review
- 10. PDC17-019 - Appendix G - Transportation Impact Analysis
- 1. PDC17-019 NOI
- SP16-016 Final Addendum for Park-Delmas CSJ 6.27.2016
- SP16-016 AppF NoiseandVibrationStudy
- SP16-016 AppE Summary of Environmental Conditions
- SP16-016 AppD GHG Conformance Checklist
- SP16-016 AppC Geotechnical Report
- SP16-016 AppB Arborist Report and Tree Protect Letter
- SP16-016 AppA AirQuality and GHG Assessment
- NOA_Draft EA-FONSI_PP16-056(6.10.16)
- FONSI-NOIRRF - N San Pedro
- DRAFT EA-FONSI
- SP16-034 - Final Response to Comments
- North 4th Street Hotel ISMND - 24May2018
- Appendix G - Traffic Analysis (1)
- Appendix G - Traffic Analysis
- Appendix F - Noise Assessment
- Appendix E - Phase I Environmental Site Assessment
- Appendix D - Geotechnical Investigation
- Appendix C - DPR and Tally Sheet and Peer Review
- Appendix B - Tree Survey
- Appendix A - Air Quality Assessment
- SM_Murphy Villas Appendix B Phase I Environmental Site Assessment
- SM_Murphy Villas Appendix A Historic Report
- Murphy Villa_PR draft IS_053118
- GPA 2017 - Appendix D - Cumulative Traffic Analysis
- GP17-002_MoorparkWaterComments
- GP17-002_Moorpark EmailComments
- GP17-002 Notice of Intent
- GP17-002 Moorpark Negative Declaration
- GP17-002 - Moorpark and Central GPA Initial Study
- GP17-002 - Appendix C - Phase I
- GP17-002 - Appendix B - Historic Report
- 5. H17-040 - Appendix B -SMP
- 4. H17-040 Appendix A - TAC Assessment
- 3. H17-040 Draft Initial Study
- 2. H17-040 MND
- 1. H17-040 NOI
- MesaGallup Housing Project
- C15-034 Mitigated Negative Declaration
- C15-034 Initial Study - web
- C15-034 Appendix B - Noise Study
- C15-034 Appendix A - GHG Emissions Analysis
- PP17-070_Addendum
- PP16-076 Initial Study
- PP16-076 Addendum
- PP14-030 PP11-076 and PP11-039 Initial Study ND and Addendum (1)
- PP14-030 PP11-076 and PP11-039 Initial Study ND and Addendum
- PDC16-041_Signed NOI_201708241355390806
- PDC16-041_ Appendix H TIA
- PDC16-041_ Appendix G Noise Assessment
- PDC16-041_ Appendix F Groundwater Quality Evaluation
- PDC16-041_ Appendix E Phase I
- PDC16-041_ Appendix D Geotechnical Report
- PDC16-041_ Appendix C Historic Report
- PDC16-041_ Appendix B Arborist Report
- PDC16-041_ Appendix A Air Quality Analysis
- PDC16-041_ 645 Horning Web-ready IS (08-18-17)_201708241315201532
- PDC16-041 Horning St RTC_clean
- PP17-027_Guadalupe_River_Trail_Master_Plan_Initial_Study-04252017
- PP17-027_Appendix_A-Biological_Assessment
- GRT Responses to Comments 6.16.17
- Fourth St John IS 10_23_17
- Appendix D - GPA Long-Range Traffic Impacts Analysis
- Appendix C - Phase I Assessment
- Appendix B - GHG Evaluation
- Appendix A - Arborist Report
- Evans Lane MND
- Evans Lane IS_MND Supplemental _RTC_Errata(5.4.16)
- Evans Lane Housing Project Initial Study - Evans Lane
- Appendix A - EDR Radius Map Report
- SP15-031 Response to County of Santa Clara Parks Letter_201701201228133487
- SP15-031 Initial Study - Equinix_201612131238134852
- Appendix F - Energy Demand and Efficience Measures Memorandum
- Appendix E- Noise Assessment
- Appendix D - Phase I Environmental Site Assessment_1
- Appendix C -Geotechnical Investigation
- Appendix B - Tree Survey and Biology Report
- Appendix A - Air Quality Assessment_2
- PDC15-067 and GPT15-007-Appendix F - TIA
- PDC15-067 and GPT15-007 Appendix E - Noise and Vibration Study
- PDC15-067 and GPT15-007 Appendix D - Phase I report
- PDC15-067 and GPT15-007 Appendix C - Soils Report
- PDC15-067 and GPT15-007 Appendix B - Historic Report
- PDC15-067 and GPT15-007 Appendix A - Air Quality Assessment
- GPT15-007 and PDC15-067 NOI_1
- GPT15-007 and PDC15-067 Empire Lumber Draft IS 9.23.16 and MND_1
- PDC14-060 Mitigated Negative Declaration
- PDC14-060 Initial Study - web
- PDC14-060 Appendix F Public Works Memo Traffic
- PDC14-060 Appendix E Phase 1 ESA
- PDC14-060 Appendix D Toxic Air Contaminants Analysis
- PDC14-060 Appendix C Initial Biological Assessment
- PDC14-060 Appendix B Conceptual Tree Mitigation Plan
- PDC14-060 Appendix A Arborist Report
- PDC14-051 Dove Hill RTC (07-24-18)_Clean_Updated
- PDC14-051 Dove Hill RTC - Attachment D Combined Comments
- PDC14-051 Dove Hill RTC - Attach C Emergency Generator Emissions
- PDC14-051 Dove Hill RTC - Attach B CalEEMod Output
- PDC14-051 Dove Hill RTC - Attach A Bio Response Memo
- 9. PDC14-051 Appendix E-2 Supplemental Geotechnical Investigation
- 8. PDC14-051 Appendix E-1 Geotechnical Investigation and Geological Hazards Evaluation
- 7. PDC14-051 Appendix D Cultural Resources Evaluation - RevWithoutArc_201804091320435519
- 6. PDC14-051 Appendix C Arborist Report
- 5. PDC14-051 Appendix B Biotic Assessment
- 4. PDC14-051 Appendix A Community Risk Assessment
- 3. PDC14-051 Dove Hill IS (04-05-18S)_rev
- 2. PDC14-051 Mitigated Negative Declaration
- 14. PDC14-051 Appendix I Traffic Analysis
- 13. PDC14-051 Appendix H Noise Analysis
- 12. PDC14-051 Appendix G Hydrology and Storm Water Management Report
- 11. PDC14-051 Appendix F-2 Soil Quality Evaluation
- 10. PDC14-051 Appendix F-1 Phase I Environmental Site Assessment
- 1. PDC14-051 Notice of Intent
- Downtown College Prep Relocation Draft IS 04 04 16
- DCP Relocation Addendum REVISED 05.24.17_201705241604347683
- CP16-013 MND
- CP16-013 IS text changes Errata_signed_1
- CP16-013 Errata_signed
- Appendix B - Traffic Impact Assessment
- Appendix A - Report 3 - Phase I
- Appendix A - Report 2 - Risk Management Plan
- Appendix A - Report 1 - Phase I and II
- CP17-023 Public Comments and Responses_Compiled_201805011059018678
- CP17-023 MND
- CP17-023 Columbine Station Improvements Project_Circulated IS
- CP17-023 Columbine Station Improvements Project_Appendix G
- CP17-023 Columbine Station Improvements Project_Appendix F
- CP17-023 Columbine Station Improvements Project_Appendix E
- CP17-023 Columbine Station Improvements Project_Appendix D
- CP17-023 Columbine Station Improvements Project_Appendix C
- CP17-023 Columbine Station Improvements Project_Appendix B
- CP17-023 Columbine Station Improvements Project_Appendix A
- Canyon Creek Retail-Commercial Building Initial Study-Mitigated Negative Declaration December 2015.doc (1)
- Appendix F - Parking Study
- Appendix E - Noise Assessment
- Appendix D - Phase I Environmental Site Assessment
- Appendix C - Geologic Hazards Evaluation
- Appendix B - Biological Evaluation
- Appendix A - San Jose General Plan Scenic Corridors Diagram
- GP16-002 Response to Comment
- GP16-002 NOI
- GP16-002 ND-revised
- GP16-002 ND
- GP16-002 IS_ND revised 09012016 for image 5-9-nd10122016_201610121037039460
- GP16-002 Draft IS CSJ-clean
- CP14-056 MND
- CP14-056 IS
- CP14-056 Errata
- CP14-056 Attachment 6 FIRM Map
- CP14-056 Attachment 5 Site Fault Zoning Map
- CP14-056 Attachment 4 Phase I Environmental Site Assessment Report
- CP14-056 Attachment 3 Soil and Hydrology
- CP14-056 Attachment 2 Historical Aerial Photographs
- CP14-056 Attachment 1 CalEEMod
- Araujo Street ISMND_Appendices
- Araujo Street ISMND
- PP16-131
- PP10-111_NDaddenda
- PP16-083_Sign Code Addendum For web
- PP13-067_ND_addenda
- PP17-015_ Incidental Shelter Ordinance - 4-25-17
- PP17-015 Negative Declaration-Signed
- FINAL_PP17-015_ Incidental Shelter Ordinance - 7-7-17
- AppE_Traffic
- AppD_Noise
- AppC_PhaseIEnvSiteAssessment
- AppB_VHPMeasures
- AppA_BiologicalResources
- AlvisoParkIS_PubRev
- AlvisoPark_RTC-Memo_Final
- CPA13-072-02 Almaden Golf Country Club_Addendum Coverpage
- CP13-072_Draft IS_MND_030314_web
- CP13-072_Draft IS_Appendices_030314_web
- Almaden Golf County Club Noise Memo 6-15-17
- Almaden Golf County Club Lighting Memo rev 6-5-17
- 4. CP17-020 Combined Appendices
- 3. CP17-020 Initial Study_180117_v2_Thai_Clean_201801311724566524
- 2. CP17-020 MND
- 1. CP17-020 NOI
- CP17-056_IS-ND-Posting_5-10-18
- CP17-056 Appendix B- traffic study April 2018
- CP17-056 Appendix A - Phase I ESA
- H14-036 Public Comments_Combined
- C16-012 H14-036 Appendix C - Noise Data Summary
- C16-012 H14-036 Appendix B - Geotechnical Report
- C16-012 H14-036 Appendix A - Air Quality and GHG Emission Estimates
- C16-012 H14-036 945 Lincoln Ave Project IS-MND
- GP17-007_IS-ND_Circulation
- APPENDIX A - Arborist Report
- GP17-007 Response to Comments
- APPENDIX C - Long-Range TIA
- PDC16-037 PD16-037 Response to Comments
- PDC16-037 PD16-037 Draft IS 2_2_17
- PDC16-037 PD16-037 Appendix D - Noise Assessment
- PDC16-037 PD16-037 Appendix C - Phase I Assessment
- PDC16-037 PD16-037 Appendix B - Tree Survey
- PDC16-037 PD16-037 Appendix A - Air Quality Assesment
- GP16-012 2700 Booksin IS
- Appendix C Traffic Impact Analysis
- Appendix B Phase I ESA
- Appendix A Arborist Report
- PDC15-027 Environmental Reso
- Final MMRP PDC15-027 - SIGNED
- Appendix E TIA
- Appendix D Noise Report
- Appendix C HMBP
- Appendix B Phase I
- Appendix A Arborist Rpt
- 1705 Berryessa Final IS w Appendices (02-16-17) (1)
- 9. PDC17-049 Appendix D Phase II Report 15980 Carlton Ave
- 8. PDC17-049 Appendix D Phase I ESA 15980 Carlton Ave
- 7. PDC17-049 Appendix C Historic Evaluation 15980 Carlton Ave
- 6. PDC17-049 Appendix C Archaeological Lit Search - for public
- 5. PDC17-049 Appendix B Arborist Report 15980 Carlton Ave
- 4. PDC17-049 Appendix A Air Quality Assess 15980 Carlton Ave
- 3. 15980 Carlton Ave Resid Initial Study 11.07.17MND_Clean_201711071755047001
- 2. PDC17-049 MND
- 12. PDC17-049 Appendix G GHG Conformance Checklist 15980 Carlton Ave
- 11. PDC17-049 Appendix F Geotechnical Investig 15980 Carlton Ave
- 10. PDC17-049 Appendix E Noise and Vib Assess 15980 Carlton Ave 07.17.17
- 1. PDC17-049 Signed NOI
- H16-004 Response to Comments_Complied_201805021923031308
- H16-004 1096 Lincoln Avenue IS_MND_201804061305026053
- Appendix C - Phase I Environmental Site Assessment
- Appendix B - Geotechnical Study
- Appendix A - Soil Resource Report
- Final RTC - 1090 S De Anza Blvd Hotel
- FINAL 1090 S De Anza Hotel Final IS-MND_201805141153323609
- C16-041 H16-032_Appendix G Preliminary Traffic Analysis
- C16-041 H16-032_Appendix F Construction Noise Modeling
- C16-041 H16-032_Appendix E Noise Modeling Results
- C16-041 H16-032_Appendix D Noise Measurements
- C16-041 H16-032_Appendix B Geotechnical Investigation
- C16-041 H16-032_Appendix A CalEEMod Results
- C16-041 H16-032_1090 S De Anza Hotel Screencheck IS-MND
- C16-041 H16-032_Appendix C Phase I ESA
- 7. Appendix E - Traffic Impact Analysis
- 6. CP17-046 - Appendix D - Noise and Vibration Assessment
- 5. CP17-046 - Appendix C - Phase I Assessment
- 4. CP17-046 - Appendix B - Arborist Report
- 3. CP17-046 - Appendix A - Air Quality Assessment
- 2. CP17-046_Bascom IS 5-21-18_Thaiedits
- 2. CP17-046 MND
- 1. CP17-046 NOI
Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.